Salient Features Of Turbine Erection
- The fore most activity before taking up the work is the safe working conditions. Thus we should first assemble temporary railing and covers before the start of the job
Advertisement
- Remove construction material & sweep the foundation well. A proper foundation is of utmost importance for proper operation of the machine. A hammer test is to be carried to detect any flaw / void in the concrete layer. An ultrasonic testing of the TG deck should also be carried out if possible. No looseness below the base plates is acceptable
- FOUNDATION CHECK: check accuracy of size, elevation & axiality of foundation for conformance the erection drawing
Advertisement
- Check all contact surfaces & openings for turbine, generator etc., Holes for anchor bolts. Record final dimensions & make a protocol
- Check, mark & record main reference point (absolute floor level) for height against building wall or foundation pillar
FOR MORE OUR POPULAR POSTS:
- Training Of Industrial Gas Turbine
- Introduction of steam turbine
- Maintenance Of Gas Turbine
- Overhauling Of Steam Turbine
- Important Questions And Answers For Steam Turbine
Turbine Erection Pdf Document Download Link is available at website comment section
Advertisement
Download Link - shorturl.at/cnOZ0
ReplyDeleteThank you
ReplyDeleteI NEED THIS PDF
ReplyDeleteTHANK YOU
ReplyDeletePlz provide pdf link
ReplyDeletePost a Comment